SN
SNJ6pilot

California High Desert Sunshine And Swim Group

Preparing pool for opening

Publié Mar 8, 2011

Réponses0
SN
SNJ6pilot
SNJ6pilotAuteur d'origine
Mar 8, 2011

Worked on the pool today, vacumn, brushed walls, added chemicals. Going to open it when water temp reaches 70, should be 75 by Memorial Day. I have large heavy duty solar blanket which warms the water into the 90s by July 4, try tomaintain it at about 85, most comfortable summer swimming. Pool is 40 feet long, 14 wide (2 lanes) and 10 feet deep at one end and 3.5 at other. Blown gunnite construction. SNJ6Pilot

RéagirRépondreS'abonner

Réponses

Pas encore de réponses.