True Nudists
Sign up free
MI
MickeyH

Off Grid Living , Renewable Energy and Nude Construction

Summer

Posted Jul 17, 2013

Replies1
MI
MickeyH
MickeyHOriginal Poster
Jul 17, 2013
So the framing has finally begun!!!
The Beam sat perfectly on the dead man I built, (the temp post to my left).
The Ground floor will be done in 3 weeks. This part is taking some extra time, I need to use a laser,(a string line would work) to get cut numbers so that no matter how far off the Block is the Floor will be perfect.
I set a Joist on top and ran it down the full length, Hit all 3 spots consistently.

Lots of pics on my Home Page, If you are not on my Friends list please add me but do make sure to addNude Constructionin the mesg.  I never accept blank requests.

Thanks,
Mick

.


ReactReplySubscribe

Replies

  • NK
    Nkdman1
    Sep 9, 2013

    sweet man!!!  will be great to see it enclosed for the winter... I hope to come visit you there some day ! Vernon

    ReactReply