Jul 17, 2013So the framing has finally begun!!!
The Beam sat perfectly on the dead man I built, (the temp post to my left).
The Ground floor will be done in 3 weeks. This part is taking some extra time, I need to use a laser,(a string line would work) to get cut numbers so that no matter how far off the Block is the Floor will be perfect.
I set a Joist on top and ran it down the full length, Hit all 3 spots consistently.
Lots of pics on my Home Page, If you are not on my Friends list please add me but do make sure to addNude Constructionin the mesg. I never accept blank requests.
Thanks,
Mick
.

The Beam sat perfectly on the dead man I built, (the temp post to my left).
The Ground floor will be done in 3 weeks. This part is taking some extra time, I need to use a laser,(a string line would work) to get cut numbers so that no matter how far off the Block is the Floor will be perfect.
I set a Joist on top and ran it down the full length, Hit all 3 spots consistently.
Lots of pics on my Home Page, If you are not on my Friends list please add me but do make sure to addNude Constructionin the mesg. I never accept blank requests.
Thanks,
Mick
.